In October 2024, we commenced the Technical Acceptance of a high-pressure reduction station.
This is the largest investment in GZOG Energy’s 20-year history and one of the most significant gas stations in the portfolio of Polska Spółka Gazownictwa.
The high-pressure reduction station, with a capacity of 100,000 Nm³/h, includes:
🔹DN250 shut-off and blowdown assembly (MOP 8.4 MPa)
🔹Filter-separator assembly
🔹Gas heater assembly
🔹Pressure reduction assembly
🔹Reduction and measurement assembly for the boiler room
🔹Boiler room
🔹AKPiA control room
🔹DN250 shut-off and blowdown assembly at the outlet
🔹Bypass pipeline assembly
🔹Interconnecting pipelines on the station premises
In addition to the technological components, the investment included comprehensive landdevelopment, pressure equipment inspections by UDT and project commissioning by the County Building Supervision Inspectorate.