Rebuilding of a Reduction and Measurement Station – Prudnik Słowicza

On 27.06.2025 we completed work on the reconstruction of the reduction and measurement station (RMS) Prudnik Słowicza and handed it over to the Investor – GAZ-SYSTEM. The scope of work included the decommissioning of the old station and the construction of a new RMS with a capacity of Q = 3000 Nm³/h. We would like […]
Construction of the first hydrogen filling station for zero-emission buses in Rzeszów

We are proud to announce GZOG ENERGY as the general contractor for the construction of the first hydrogen filling station for zero-emission buses in the Podkarpacie region in Rzeszów! The PKS Rzeszów hydrogen station will be built in the depot at Wyzwolenia Avenue. The facility will serve buses at 350 bar at 15°C. The installation […]
Construction of a reduction and measurement station w/c with a capacity of Q = 2000 Nm3/h, together with the entire accompanying infrastructure in Dzierzgoń

We have completed the construction of a reduction and measurement w/c gas station with a capacity of Q = 2000 Nm3/h together with the entire accompanying infrastructure in Dzierzgoń The scope of works included: Construction and commissioning of a w/c reduction and metering station with a throughput of Q = 2000 Nm3/h, together with a […]
2024 – High-Pressure Reduction Station

In October 2024, we commenced the Technical Acceptance of a high-pressure reduction station. This is the largest investment in GZOG Energy’s 20-year history and one of the most significant gas stations in the portfolio of Polska Spółka Gazownictwa. The high-pressure reduction station, with a capacity of 100,000 Nm³/h, includes: 🔹DN250 shut-off and blowdown assembly (MOP […]
2023 – Completion of Pipeline Reconstruction in Konin

In 2023, the “Reconstruction of Raw Water Pipelines for the Water Treatment Plant in Konin – Phase II” project was completed under the design-and-build model. The renovation involved pipelines with diameters of DN400, DN315, DN250, and DN225, totaling 3,000 meters, using close-fit PE pipe technology.
2023 – Completion of the Water Pipeline Renovation in the Czech Republic

Renovation of a DN400 water pipeline over a distance of 5,900 meters in the towns of Sobeslav, Klenovice, and Roudna located in southern Czechia.
2022 – Completion of the CNG Station in Gliwice

Construction of a CNG station in Gliwice at Rolników Street, with a capacity of 300 m³/h. The station features a gas dryer, a dual-hose dispenser, and a gas storage tank with a water capacity of 4,500 liters
2022 – Completion of the CNG Station in Opole

Construction of a CNG station in Opole, Grotowice, with a capacity of 300 m³/h. The station includes a gas dryer, a dual-hose dispenser, and a gas storage tank with a water capacity of 4,500 liters
Gas Network Reconstruction – Reduction and Measurement Station (Q=10,000 m³/h)

On November 5, 2024, the Technical Acceptance was conducted for the project titled “Gas Network Reconstruction – Reduction and Measurement Station (Q=10,000 m³/h)”, completed for Polska Spółka Gazownictwa. The facility consists of two containers:Container 1: Houses the gas odorization unit, a gas-powered boiler room, and the reduction and measurement station.Container 2: Contains the control and […]